Installation Policy

What would you like help with today?

Installation Policy

Your questions answered. Your concerns resolved

Installation

 

This Installation Policy outlines our procedures, terms, and conditions regarding the delivery and installation of our products and services. It provides a clear understanding of what to expect during the installation process, including scheduling, site requirements,

From the moment your order is confirmed, our goal is to ensure a smooth, timely, and professional installation experience. Our team will co

We are committed to delivering hassle-free installations with high service standards, careful attention to detail, and open communication.

By purchasing and using our products or services, you acknowledge and agree to the terms outlined in this Installation Policy, ensuring a shared understanding that allows us to provide the best possible service and a successful installation experience.

.

There is no charge for basic product installation which includes standard water tubing up to 10 meters length and standard valve.

At the moment, installation services are available exclusively for our products within the Kuala Lumpur and Selangor areas. Please contact us for further information.

Our technical team will contact you to arrange the product delivery and installation once your purchase has been successfully completed.

The process typically takes approximately 3–5 working days after order confirmation.

We can perform surface drilling on wooden and plastic countertops with your consent. However, for drilling on marble, granite, or stainless-steel surfaces, as well as any hacking work, we kindly advise engaging a professional contractor.

For tankless type water purifier, the minimum water pressure is 1.2 Bar / 17.4 Psi.
For tank type water purifier, the minimum water pressure is 0.5 Bar / 7.2 Psi.

If the water pressure at your premises falls below the required PSI level, you may need to install a booster pump at your own expense.